The facts

Client:   Jockey Club Racecourses Ltd 
Location:  Epsom, Surrey
Services:  Civil and Structural Engineering
Sector:   Sport and Leisure
Contract Type:  Design and Build
Project Value:  £38m
Start/Completion: July 2007 - June 2009

The project

When Her Royal Highness, The Duchess of Cornwall, officially opened the new Duchess’s Stand at Epsom Downs Racecourse it marked the final part of a three year, £38 million redevelopment project.

Capita Symonds provided civil and structural engineering services on all aspects of the project, including the construction of a new Entrance Pavilion and a 120 bedroom on-site hotel and the centerpiece - the 11,000 capacity Duchess’s Stand. This impressive building boasts the 1,123sqm Oaks Hall on the ground floor while the second floor features 14 private boxes and the plush Downs View suite – an exclusive room for around 100 people with spectacular views of the course.

The racecourse’s redevelopment programme began in August 2006 with the demolition of the Rosebery Stand and the building of the new Entrance Pavilion. The second phase involved the knocking down of the original 1914 Building and Grandstand and the construction of the new Grandstand. The project also involved the design and construction of a new 120 room Holiday Inn Express adjacent to the Racecourse.

The Duchess’s Stand is a steel-framed structure, incorporating a reinforced concrete ground floor, precast hollow core first and second floors and together with plant access floors at mezzanine levels. A structural deck roof spans between the main, curved, steel plate girders at approximately 8m centres, forming a 26m cantilever canopy over the precast concrete stepping units track side. The curve of the main roof and rafters together with the roof cantilever provide one of the building’s main architectural features.

Steel floor beams have been used but because of the significant (up to 16.5m) spans and the need for a transfer structure at second floor, a variety of steel trusses have been used in the first and second floor construction with varying depths depending on location. Hanging points have been provided to several first floor trusses over the Betting Hall to provide flexibility in the use of the space for conventions, exhibitions etc.

Awards

  • Short-listed for Construction News Quality Awards
Bookmark and Share