The facts
Location: Green Park Underground Station,
Central London
Client: Joseph Gallagher (Tube Lines Limited
project)
Start Date: February 2009
Completion Date: December 2010
Contract Type: NEC Option C (target
fee)
Procurement method: Design and Build
Project Construction Value: £10m, approx £1m
fees
Services provided: Civil Design, Project
Assurance, Project Planning / Programming, Environmental, Document
Control / Hosting Extranet Site, Site Supervision
Key Supply Chain Member: Dr G Sauer Company Ltd..
Sprayed concrete lining design
Capita Symonds contact(s): John Tomkins / Project
Director, Josh Shalders/ Project Manager, Phil Wall / Design
Manager
The project
The project involved the construction of a shaft and associated
connecting tunnels within Green Park Underground Station to allow
the installation of two lifts to provide step free access for the
two underground lines which serve Green Park.
The shaft and tunnels were to be constructed close to
existing underground infrastructure and pass close to an existing
escalator which was susceptible to ground movements.
Capita Symonds was lead designer for Gallagher. This
included specialist support to them for programming and
environmental work as well as the delivery of a design assured to
Tube Line / London Underground standards.