The facts
Client: Gunhild
Way Primary School
Project value: £7.3m
Procurement method: Strategic
Partnership
Contract
Type: Traditional
Project start date: March 2010
Project end date: August 2011
Services: Architects, Structural
Engineers, Building Services, Clerk of Works, QS, project
management
The Project
GunhildWay
School is the first Cambridgeshire County Council school hoping to
achieve BREEAM ‘Excellent’ rating.
Gunhild Way lies to the south east of Cambridge City Centre.
The primary school is designed for 480 students and 60 staff
members. The School has been designed to be wholly accessible
providing an individual, attractive, robust and adaptable internal
and external environment which is enjoyable, stimulating and
conducive to achieving excellent standards of working and learning.
The careful design optimises the balance between dedicated and
shared spaces to achieve the most efficient relationship between
different areas. The school is divided into four distinct elements
each expressed differently and detailed to reflect its purpose.
The design has been carefully developed to optimise the balance
between dedicated spaces and shared spaces and to obtain the most
efficient relationship between the different areas. The sharing of
support facilities is has been actively incorporated.
The new primary school footprint covers an area of 1996m² and it
is disposed in two floors giving a total area of 3632m². The new
build area is approximately less than 10% of the whole site.
| |
|
| The BREEAM Rating and Score |
Hoping to achieve excellent rating with an estimated score of
73.16% |
| The Key Innovation and low impact design features of
the building |
Rainwater harvesting, and Ground Source Heat pumps |
|
BasicBuildingCosts |
£7.3M |
| Service Costs |
£45.06 (This includes new EDF Substation; trenching for
services; external lighting and GSHP boreholes) |
| External Works Costs |
£403.29 (External Works; Drainage & Minor Building
Works) |
| M&E Cost |
£/m2 of GFA = £454.94 |
| Abnormal Cost |
£/m2 of GFA = £63.35 (This includes Sprinkler System and
Kitchen Equipment) |
| Gross Floor Area |
Ground Floor 1933m²
First Floor 1460.2m²
TOTAL
3393.2m²
|
| Total Area of Site |
20,802m²
2.080 Ha
|
| Function areas and Sizes |
See Accommodation Schedule |
| Area of circulation |
Ground Floor 343.58m²
First Floor
335.3m²TOTAL 678.9m²
|
| % of grounds to be used by shared
facility |
194.7m²
% of Site 0.94
% of Total School Area 5.74
% of Ground Floor 10.1
|
| Predicted electricity consumption |
97198 kWh/annum = 28kWh/m2 (3448m2 floor area) |
| Predicted fossil fuel consumption |
kWh/m - 9090 kWh/annum = 2.63kWh/m2 (3448m2 floor area) |
| Predicted renewable energy
consumption |
266834 kWh/annum = 77kWh/m2 (3448m2 floor area – Ground Source
Heat Pump energy consumption, no energy is generated on site) |
| Predicted water use m3/person/year |
3m3/person/year |
| % predicted water use from rainwater
harvesting |
38% |
View the ground
floor plans, first
floor plans. and the
accommodation plans.