The facts

Client:   Gunhild Way Primary School
Project value:  £7.3m
Procurement method: Strategic Partnership
Contract Type: Traditional
Project start date:  March 2010
Project end date:  August 2011
Services:   Architects, Structural Engineers, Building Services, Clerk of Works, QS, project management

The Project

GunhildWay School is the first Cambridgeshire County Council school hoping to achieve BREEAM ‘Excellent’ rating.

Gunhild Way lies to the south east of Cambridge City Centre.

The primary school is designed for 480 students and 60 staff members.  The School has been designed to be wholly accessible providing an individual, attractive, robust and adaptable internal and external environment which is enjoyable, stimulating and conducive to achieving excellent standards of working and learning. The careful design optimises the balance between dedicated and shared spaces to achieve the most efficient relationship between different areas. The school is divided into four distinct elements each expressed differently and detailed to reflect its purpose.

The design has been carefully developed to optimise the balance between dedicated spaces and shared spaces and to obtain the most efficient relationship between the different areas. The sharing of support facilities is has been actively incorporated.

The new primary school footprint covers an area of 1996m² and it is disposed in two floors giving a total area of 3632m². The new build area is approximately less than 10% of the whole site.

   
The BREEAM Rating and Score Hoping to achieve excellent rating with an estimated score of 73.16%
The Key Innovation and low impact design features of the building Rainwater harvesting, and Ground Source Heat pumps
BasicBuildingCosts £7.3M
Service Costs £45.06 (This includes new EDF Substation; trenching for services; external lighting and GSHP boreholes)
External Works Costs £403.29 (External Works; Drainage & Minor Building Works)
M&E Cost £/m2 of GFA = £454.94
Abnormal Cost £/m2 of GFA = £63.35 (This includes Sprinkler System and Kitchen Equipment)
Gross Floor Area Ground Floor  1933m²

First Floor  1460.2m²

TOTAL   3393.2m²

Total Area of Site 20,802m²  

2.080 Ha

Function areas and Sizes See Accommodation Schedule
Area of circulation Ground Floor  343.58m²

First Floor  335.3m²TOTAL   678.9m²

% of grounds to be used by shared facility  194.7m²

 % of Site  0.94

 % of Total School Area  5.74

 % of Ground Floor  10.1

 Predicted electricity consumption 97198 kWh/annum = 28kWh/m2 (3448m2 floor area)
Predicted fossil fuel consumption kWh/m - 9090 kWh/annum = 2.63kWh/m2 (3448m2 floor area)
Predicted renewable energy consumption  266834 kWh/annum = 77kWh/m2 (3448m2 floor area – Ground Source Heat Pump energy consumption, no energy is generated on site)
Predicted water use m3/person/year 3m3/person/year
% predicted water use from rainwater harvesting 38%

View the ground floor plans, first floor plans. and the accommodation plans.