Capita Symonds Website - Limerick Tunnel, Ireland
 
Skip Links
 

Projects

Find a project:

Limerick Tunnel, Ireland

New Page

Image 1 of 6

New Page

Image 2 of 6

New Page

Image 3 of 6

New Page

Image 4 of 6

New Page

Image 5 of 6

New Page

Image 6 of 6

  • New Page
  • New Page
  • New Page
  • New Page
  • New Page
  • New Page

The facts

Client:   DirectRoute
Location:  Limerick, Ireland
Services:  Tunnel Design, Geotechincal Engineering
Sector:   Infrastructure
Contract Type:  Hybrid
Project Value:  €605
Start/Completion: 2005 - 2010

The Project

The €605m Limerick Tunnel, which opened to the public in July 2010, is capable of handling up to 40,000 vehicles per day, relieving the congested roads in and around the ancient city of Limerick.

This immense PPP (Public Private Partnership) project features 11 bridges, 10km of two lane dual carriageway; 2.3km of single lane dual carriageway, a 750m causeway across Bunlicky Lake and a 675m long tunnel under the River Shannon.

Capita Symonds provided specialist design services on behalf of the construction joint venture DirectRoute on the project, including its five huge 100m long, 18,000 tonne immersed tunnel units. Our work has also included the detailed design of the cut and cover tunnels and approach ramps on each bank of the river.

In addition to the design of the civil works, we were also responsible for the conceptual design of the mechanical and electrical systems; the ventilation, lighting, pumped drainage and control systems; and for the conceptual design of the new road’s intelligent transport system.

Capita Symonds is a world leader in immersed tunnel design, recent projects include the Jack Lynch Tunnel, also in Ireland, the Øresund Tunnel, which provides a combined road and rail link between Denmark and Sweden, road tunnels under the rivers Conwy and Medway in the UK, and tunnels in Norway, Greece and Hong Kong.

Bookmark and Share