The facts:
Sector: Transport
Location: London
Client: Morgan Est. Rail (MER)
Start Date: 2008
Completion Date: 2009
Cost: £50m
Servives: Architecture, Mechanical and
Electrical Engineering, Civil Engineering, Structures and
Services
The project:
Morgan Est. Rail (MER) were contracted to complete the
Design and Construction of the above ground works of Shepherds Bush
Station and via Capita Symonds procured a fully integrated Design
and Deliver Team that included elements of specialised design under
the control of Capita Symonds. An objective was to also incorporate
fast track design and London Underground assurance process to
achieve station closure opportunities.
Capita Symonds procured a fully integrated design
and delivery team which incorporated elements of specialised
design. Capita Symonds design also ensured that the station was
operational throughout all stages of the project.
By being seconded on site with the contractor and client (Westfield
and London Underground), Capita Symonds was able to work with them
as a team to deliver ahead of time for the Westfield shopping
centre opening.