Capita Symonds Website - Primary Capital projects
 
Skip Links
 

Find a project:

 

Southwark Primary School

The first primary school in Nottingham to achieve a BREEAM ‘Excellent’ rating, Southwark Primary School is located in Old Basford in the heart of Nottingham. The new school caters for 630 children aged 5-11 while the nursery caters for 90 children aged 3-5. The school is organised into family clusters gathered around an open courtyard providing a number of unique spaces that will help the school explore a variety of innovative teaching styles.

Children have the opportunity to learn and play in a wide diversity of internal and external environments including large hub spaces, adventure playgrounds, a theatre style main hall; and a ‘sky rocket’ - a retreat zone providing specialist support within a peaceful, inspirational setting looking over the green rooftops and courtyard space.

Value: £13. 5m
Services: Lead Consultant / Architecture, Environmental Design, Civil & Structural Engineering, Landscape Architecture, ICT, Acoustics, Security & Fire Engineering
Start/Completion: 2009–2010

Robin Hood Primary School

The main challenge was to transform an existing dislocated school plan into landmark building and focus for the community. The aspiration is geared toward creation of a school with fun, creativity and pupil achievement at its heart which in turn showcases healthy and sustainable lifestyles.

The scope of the project comprised a new-build classroom block to house Key Stage 2, a number of whole school facilities and the entrance. The new block will centre around the Key Stage 1 and foundation areas and will form a new heart and gathering space for the school. Improved pedestrian access onto site and a significant new build that addresses this will give the school real presence in the community.

When complete, the school will house 210 pupils aged 4-11 as well as a 30 place nursery.

Value: £2.8m
Services: Lead Consultant / Architecture, Environmental Design, Civil & Structural Engineering, Landscape Architecture, ICT, Acoustics, Security & Fire Engineering
Start/Completion: 2009-2011

Greenfields Primary School

Greenfields Community School was spread across two buildings at opposite ends of the site. The Foundation Unit sits within an existing Sure Start Children’s Centre and is physically separated from the main school.

The school caters for up to 210 pupils aged 4-11 as well as a 30 place nursery. The two parts of the school have been brought together and access has been improved. The improvements included breaking down an existing footpath link into outdoor learning classrooms and gathering spaces creating opportunities for teaching and learning within a landscaped setting.

The transformation of the main school building centres around the creation of a new flexible learning hub and café/library in the old multi-purpose hall space. This provides a real heart for the school which it is hoped will draw parents into the school to experience learning as well as getting involved in the school life. The two buildings are further brought together by the creation of a new PE/play-barn as an extension to the main building that faces the landscaped route to the foundation unit.
This whole school facility is not only a clear signal of transformational change but is enhancing the sense of place created by the spaces around it and its connection to the landscape.

Value: £1.4m
Services: Lead Consultant / Architecture, Environmental Design, Civil & Structural Engineering, Landscape Architecture, ICT, Acoustics, Security & Fire Engineering
Start/Completion: 2009-2010

Blue Bell Hill Primary School

Blue Bell Hill Primary is located in a 1930s former girls school. Although this period building has been remodelled and extended several times it was in need of investment to prepare it for 21st century education.

The school caters for 210 pupils aged 4-11 as well as a 30 place nursery. The school provides a welcoming environment for pupils and families, acting as a focal point for the local community and a clear sign of transformational change.

The refurbishment and remodelling has created a meeting place for parents, enabling them to become involved in school life, which will be adjacent to family and extended learning facilities to form a real community hub. A ribbon of hub spaces flow from the meeting place in a circular path through the building, enhancing and clearing out existing break out areas to provide shared areas between classes that can facilitate a number of different learner settings and enhance teachers’ flexibility. All classrooms have been remodelled to enhance the teaching and learning environment and to provide better connection to new outdoor learning areas.

Value: £1.3m
Services: Lead Consultant / Architecture, Environmental Design, Civil & Structural Engineering, Landscape Architecture, ICT, Acoustics, Security & Fire Engineering
Start/Completion: 2009–2011

Henry Whipple Primary School

The brief was to remodel and refurbish the existing school to facilitate 21st century teaching and learning. The transformed school and the creation of a landmark building will improve the school’s standing in the community, making it more accessible while being able to provide extended school facilities with a family focus.

The school caters for 210 pupils aged 4-11 as well as a 30 place nursery. Previously, the school consisted of linear classroom blocks arranged around a split level courtyard and is built into a south facing sloped site. The improvements involved roofing over the central courtyard with a translucent envelope to form a tempered environment for outdoor learning, play and school/family activities. This ‘one school’ space is the heart of the scheme and delivers the scale and landmark status that the school needs. In addition, existing classroom blocks were remodelled and refurbished and a new admin and entrance pod within the roofed-over courtyard has been created.

Value: £3.3m
Services: Lead Consultant / Architecture, Environmental Design, Civil & Structural Engineering, Landscape Architecture, ICT, Acoustics, Security & Fire Engineering
Start/Completion: 2009-2010

Robin Hood / Henry Whipple images © virtual planit

Bookmark and Share